Evolv projects begin with a period of initialization. During this time, some base data is collected on the variant performance to guide the optimization phase.
Every combination Evolv runs has a number of participants required before the data is considered stable enough to act on. This is based on the conversion rate of the metric.
When all combinations have received this number of participants, Evolv will move to the evolution phase and begin optimizing combinations of variants.